PROJECT BRIEF

WATERS EDGE

Through mass excavation reaching into shale limestone, this high-rise condo building resulted in seven floors of underground parking.
A soil management plan was designed to prevent and regulate exposure to contaminants of concern (COC) at the site.
Cat 345 long reach excavator with a excavation depth of 75 feet was utilized to remove the final ramp.

LOCATION

Toronto, ON

FEATURES

80,000 M3 soil disposed offsite
6 level undergrounds parking excavation
Earth, shale, limestone excavation

SERVICES

Mass excavation offsite
Environmental Remediation
Detailed foundation excavation

2
3